84 public housing units in Mina del Morro

The initial programme of need, proposed for the Europan 4 competition, envisaged the construction of 356 dwellings on an area of 29,500 m2. This residential area was complemented by 8,700 m2 of commercial space and 16,100 m2 of tertiary use space, plus 4,400 m2 of social facilities. Naturally, road and parking facilities had to be resolved and the site had to be provided with green areas and outdoor public spaces.

View gallery

The site is located on the edge of the Sagarminaga neighbourhood -a heterogeneous group of housing buildings for the lower classes-, built in the fifties and sixties with a high building density and poor urban quality. The terrain was steeply sloping and had previously been occupied by a now disused mining operation, which had dug numerous galleries into the subsoil.

From the very first moment we were interested in the frontier character of the place, a no-man's land between the old town and the outskirts, between the river Nervión and the mountain, between nature and the city...

X BEAU

The project explored this ambiguous condition. Therefore, one of the operations investigated in the project was the manipulation of density to attend to the different conditions that were becoming present after the initial indeterminacy of the site, whose mixed-race nature has always been preserved.

X BEAU

To meet the needs of the immediate vicinity, we proposed a fairly introverted, low-rise neighbourhood cluster, surrounded by a higher perimeter that concentrated tertiary commercial and amenity space, well connected to the neighbourhood. The existing, very dense neighbourhood was sponge-formed by preserving for public use two large, sunny, open spaces with distant views, and the open areas between the towers were conceived as urban viewpoints. In the heart of the cluster, the buildings are built on a carpet of green spaces, the roads are laid out in an inner ring, while the car parks are concentrated in the perimeter buildings.

X BEAU

General information

84 public housing units in Mina del Morro

YEAR

2007

Status

Built

Option to visit

Visit from public roads

Address

St. Ortutxueta,

48006 Bilbao - Bizkaia

Latitude: 43.25062912

Longitude: -2.91941626

Classification

Building materials

Concrete

Glass

Built area

más de 20000 m²

  • X BEAU
  • X BEAU
add

Location

43.25062912 -2.91941626 44e65fe9-fed5-4c41-a9e9-f36073b891cf Built
Click to activate the map
Built
Temporary
Lost
Unbuilt project

Itineraries

Cookies policy

GNOSS usa cookies, propias y de terceros, con finalidad principalmente técnica y necesaria para prestación de nuestros servicios y mostrarles contenido relevante. Más información en nuestra  política de cookies .

ACEPTA para confirmar que has leído la información y aceptado su instalación. Puedes modificar la configuración de tu navegador.