Red Eléctrica's Regional Operation Centre

Built on Isla de la Cartuja in Seville for the 1992 World Expo, this building, also known at the time as the "Pabellón de la Luz", was not actually a pavilion for the Expo, but a permanent building as the Regional Operations Centre of the Spanish Red Eléctrica , which has been in operation ever since. It was the place from which the production and expenditure of electrical energy for the whole of Andalusia was controlled.

View gallery

The project was conceived as a restricted, secluded place, somewhat isolated from the island as a whole. It consisted of three buildings contained within the open space framed by four tall translucent marble screens. The three buildings contained the following uses: one of them (the glazed one) the offices of the Centre; the second, attached to the larger one (enclosed in opaque marble) basically the high-tech facilities of the Centre: control room, with its mimic and communications; and a third isolated building, also enclosed in opaque marble, with the distribution and dissemination activities of REE (Red Eléctrica de España).

II BEAU
II BEAU

The three are linked by a service and parking plate in the basement. The three are located in a free, controlled and intense space in the form of a courtyard or open market, a silent room, with a pool of sprayed water at a height of one metre "a tapestry that will play with the light, giving rise to another motif of suggestions and iridescence related to the family of the marble veins of the membrane that houses it...". And it will produce a continuous, "cleansing" sound (from the Competition Memory).

II BEAU

Timeless, abstract building, closer to infrastructures than to buildings. No façades. And yet, the envelope becomes the basic energy and sensory balancer of the whole (temperature, light, ventilation and acoustic insulation). A levitated "walled" enclosure. In the crystallisation of the marble (found in the Portuguese Alentejo and cut in Cintra, near Lisbon) is the homage to the light, which passes through it and contains it. By day inland and by night in the city. The light coming from the controlled electrical energy and the emerging light diffracted in the pulverised water offer their reunion in the different registers of the building's life.

General information

Red Eléctrica's Regional Operation Centre

YEAR

1992

Status

Built

Option to visit

Visit from public roads

Address

St. Inca Garcilaso, 1

41092 Sevilla - Sevilla

Latitude: 37.392360591

Longitude: -6.011297205

Classification

Building materials

Marble

Steel

Glass

Construction system

Translucent marble, concrete screens, concrete slabs, light metal structures, wrought iron, laminated timber, steel, glass.

Built area

501 - 5000 m²

Awards

II BEAU

Involved architects

Mariano Bayón Álvarez

Involved architectural firms

Bayón Arquitectos

Information provided by

Bayón Arquitectos

add

Location

37.392360591 -6.011297205 7ee61764-773f-46e7-b6f2-2a6949c16f4d Built
Click to activate the map
Built
Temporary
Lost
Unbuilt project

Cookies policy

GNOSS usa cookies, propias y de terceros, con finalidad principalmente técnica y necesaria para prestación de nuestros servicios y mostrarles contenido relevante. Más información en nuestra  política de cookies .

ACEPTA para confirmar que has leído la información y aceptado su instalación. Puedes modificar la configuración de tu navegador.